Environmental Industries has the ability to undertake a range of civil landscape construction works across Perth. With a highly experienced team, our capabilities include:

  • Demolition
  • Bulk earthworks
  • Site clearing
  • Drainage (sewer and storm water)
  • Water service installation
  • Electrical services installation
  • Car park and road construction
  • Concrete structures (in-situ or precast)
  • Paving
  • Retaining walls
  • Lake construction
  • Customised steel fabrication

Civil Landscaping Projects

Some civil landscaping and earthworks projects we have successfully completed includes Katanning Welcome Precinct, New Junction Midland, Stage 1: Wharf Street Generation Community Park and Alan Anderson Park.

Kattanning Welcome Precinct

Project Description

The Shire of Katanning contracted Environmental Industries to undertake the renovation and rejuvenation of their Welcome Precinct Playground. The project was funded by the Shire of Katanning, Royalties for Regions, and Lotterywest.

The precinct was designed by PLAN E Landscape Architects and involved significant enhancement of the parks facilities and play areas. The improvements to the area provide an exciting destination for both local residents and tourists.

Project Inclusions

  1. Demolition Works
  2. Earthworks
  3. Stormwater Drainage
  4. Roadworks & Carpark
  5. Rock Climbing Wall
  6. Skate Park
  7. Raised Walkway
  8. Significant Play Equipment Installations
  9. Refurbishment of Existing Play Equipment
  10. Rubber & Sand Softfall
  11. Shade Structures & Arbours
  12. Furniture
  13. Electrical, Lighting & CCTV Works
  14. Hard Landscaping
  15. Irrigation Works
  16. Soft Landscaping

Karri Valley

Project Description

RAC Tourism and Assets Pty Ltd contracted Environmental Industries to construct the new caravan park at Karri Valley Resort. We completed over 28,000 cubic metres of bulk earthworks for this project including clearing, topsoil stripping and respreading, cut to fill, and importing of fill across the 50,000m2 site.

New infrastructure for this project included: entry roads, stormwater drainage, water reticulation, sewer reticulation, underground power and communications, and gas works. This project required 20 new concrete pads to be installed to cater for caravans and annexes.

Project Inclusions

  1. Clearing
  2. Topsoil stripping / re-spreading
  3. Cut to fill
  4. Cut to stockpile
  5. Imported fill
  6. Roadworks
  7. Stormwater drainage
  8. Water reticulation
  9. Sewer reticulation
  10. Fire tanks, reels, and standpipes
  11. Irrigation system
  12. Underground power and communications
  13. Gas infrastructure
  14. Concrete pads for caravans

Issues Resolved

  • Successfully Value Engineered the project to achieve the client’s budget without impacting the design intent.Resolved the latent and adverse geotechnical conditions encountered during the Bulk Earthworks works economically with innovative construction methodology.
  • Resolved the latent and adverse geotechnical conditions encountered during the Bulk Earthworks works economically with innovative construction methodology.

 

Oyster Harbour – Stage 4 Lake POS

Project Description

The Oyster Harbour Joint Venture appointed Environmental Industries to undertake the Lake Construction and Landscape Works at Oyster Harbour Stage 4 Lake POS.

The Stage 4 Lake POS encompassed 30,000m2. The lake construction involved dewatering works, a geosynthetic clay liner, clean sand fill, and laterite boulders to the lake edge and overflow outlet.

Significant structural work was completed on the project including custom shelters, custom boardwalks, and balustrades.

Project Inclusions

  1. Lake construction including lake liner
  2. Subsoil drainage
  3. Rockwork surrounding the lake
  4. Curved limestone blockwork around the lakes edge
  5. Concrete footpaths
  6. Unit paving
  7. Irrigation works including construction of a new bore
  8. Custom boardwalks
  9. Shelters
  10. Furniture
  11. Soft Landscaping

Issues Resolved

  • Dewatering: Works were undertaken at the end of the winter. Dewatering was successfully undertaken to enable the commencement of the lake works.
  • There was a tight programme to ensure that the works were to be complete prior to the Christmas holidays. Environmental Industries was able to complete the works ahead of schedule due to strict programming and planning.

 

Contact Us for Civil Landscaping Services Today

The experts at Environmental Industries set the benchmark for civil landscaping and earthworks services. As one of Perth’s most trusted commercial landscaping companies, we deliver exceptional results using top of the line equipment. Contact us on (08) 9256 6500 to find out more about our services today.

View Civil Projects